• Medical Gas Zone Valve Box for Hospital Gas Supply System
  • Medical Gas Zone Valve Box for Hospital Gas Supply System
  • Medical Gas Zone Valve Box for Hospital Gas Supply System
  • Medical Gas Zone Valve Box for Hospital Gas Supply System
  • Medical Gas Zone Valve Box for Hospital Gas Supply System
  • Medical Gas Zone Valve Box for Hospital Gas Supply System

Medical Gas Zone Valve Box for Hospital Gas Supply System

Color: Sliver/Customized
Application: Medical
Certificate: CE, ISO, SGS
Warranty: One Year
Name: Central Gas Supply
Technology: Psa
Customization:

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Transport Package
Wooden Case
Trademark
ETR
Origin
Changsha China
HS Code
8419601900
Production Capacity
200 Set

Product Description


medical Zone Valve Box for hospital gas supply system

Discription

1.Meet the standards of GB50751-2012 Technical Specification for Medical Gas Engineering;
2.Dual circuit design for the gas stop and gas pressure regulation, one for use and one forstandby, which can ensure for the maintenance without gas stopping;
3.Gas bypass circuit design: bypass circuit of emergency oxygen supply can be opened in caseof system failure to ensure safely oxygen supply;
4.The input and output gas pressure gauge with maintenance valve, can be maintained without gas stopping;
5.With emergency door lock which can be started by opening the valve box directly to close valve;
6.Automatic opening mode with pneumatic pole ensure for the convenient operation and elegant appearance.

 

7.Used to control the on and off of medical gases in the area;
8.1~6 channels of medical gas can be controlled according to user requirements; 
9.Silver and copper welding to prevent leakage;
10.Transparent window for easy operation and maintenance; 
11.Each gas is marked with a national standard color for easy identification.



Medical Gas Zone Valve Box for Hospital Gas Supply System


AFTER SALES SUPPORT
1.Warranty &Training


Warranty
The Guarantee/Warranty Period shall be a period of twelve months after on-site startup & commissioning or eighteen months after shipment, whichever occurs first. If any trouble or defect, originating with the design, material, workmanship or operating characteristics of any Goods, arises at any time during GUARANTEE/WARRANTY period, ETR shall, at his own expense and as promptly as possible, make such alterations, repairs and replacements.
On-Site Support
ETR can do paid services of on-site startup, commissioning, installation supervision, training, by providing purchaser with the services of qualified English-speaking
engineer at site. ETR shall obtain all permits and licenses required to perform the services under this Agreement. 

-Workshop - 

Medical Gas Zone Valve Box for Hospital Gas Supply System

  - Market And Successful Cases - 

Medical Gas Zone Valve Box for Hospital Gas Supply System

Chinese people liberation army the

85th hospital

Medical Gas Zone Valve Box for Hospital Gas Supply System


Hospital description
Chinese People's Liberation Army the 85th hospital is a three-level general hospital with 1200 open beds and an area of 161 acres. It has one military-level research institute, four military-level specialist centers and a number of featured disciplines. It has nearly forty million dollars of large-scale medical equipment such as nuclear magnetic resonance, DSA, 16-row and 64-row CT, PET-CT, linear accelerator and whole body gamma knife.
 

Project description
This project is including as following:
Medical Oxygen generation system with pair assembly
Medical Suction system(vacuum negative pressure system)
Wards nursing system
Medical gas management system
Medical compressed air system
Bed head unit
 


Our Service

1. Setting trace file for every sold product, quarterly survey for every sold product.
2. Providing remote instruction and training for free.
3. Providing on-site services and repairs for free during warranty period if problems caused by Eter.
4. Spare parts and on-site service would be changed with best price after warranty period.
5. 7*24 hours online service for free, giving solution for any problems within 48 hours. 
6. If customer required, assigning experienced after-sales engineer for on-site service with 7 days. (Visa apply should be considered)

 


CE,ISO13485,TUV,SGS
Medical Gas Zone Valve Box for Hospital Gas Supply System

AFTER SALES SUPPORT -
Warranty
The Guarantee/Warranty Period shall be a period of twelve months after on-site startup & commissioning or eighteen months after shipment, whichever occurs first. If any trouble or defect, originating with the design, material, workmanship or operating characteristics of any Goods, arises at any time during GUARANTEE/WARRANTY period, ETR shall, at his own expense and as promptly as possible, make such alterations, repairs and replacements.
On-Site Support
ETR can do paid services of on-site startup, commissioning, installation supervision, training, by providing purchaser with the services of qualified English-speaking
engineer at site. ETR shall obtain all permits and licenses required to perform the services under this Agreement. 

FAQ:

 Are you manufacturer or trade company?
    We are the manufacturer of Medical Oxygen Plant For Cylinder Filling, founded in 2003.

What terms of payment you use?
   T/T, L/C etc.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now